Change Orders. Two words dreaded by architects that contractors LOVE to say.

So everything is going wrong. The kitchen plan that I approved.. oops, was wrong and so the kitchen on one side was built for 9'6" instead of 9'2". The cabinets can't be cut down and so I have to pay the contractor to rebuild the wall 4" over. Also, to make matters worse, I have a crack in the waste line of my toilet so when I flush shit flies out of a hole on top of the woman below me. It's just a crack but it's recommended i replace that segment. Maybe I should get a second opinion...but then I'd have to pay for one so at this point I just want it fixed.

Change Orders:

1) electric (added under cabinet lights + bedroom light)
2) waste line
3) snaking the whole system cause it's clogged like crazzzzzzzzy
4) rebuild entire wall + soffit

If I enter bankruptcy please understand it's cause I wanted my apt to be pretty and it's really all my fault that I couldn't just live with the late 60s metal cabinets, pink bathtub, and just sitting sideways on my toilet cause the metal wall hamper stuck out too far. shit

No comments:

Post a Comment